Even the
best system needs to be renewed at someday. However, renewing does not mean to
replace completely. With the FMT24S Central Processor we present the modern
update for the longstanding EPRO Control System. This change is urgently
needed, as for the ArcNet-System no spare parts will no longer be available in
the foreseeable future and thus problems in future production processes are
programmed. To avoid this situation, we have developed a solution, which
modernises your system where it is necessary, so that you will have an
up-to-date timing system. Instead of the old DOS-computer a modern PC with
Windows Operation System and a special version of the FMT24S-Software will be
used. The network connection is done via an own Ethernet connection. The network
components like switches, cables and connector systems will be updated.
Up-to-date,
versatile, long-lasting – the EPRO Upgrade Kit secures your production offering
new possibilities.
Your advantages
- Latest Central Processor Generation
- Additional functions from the FMT24S Control System
- Ethernet- instead ArcNet-network
- Windows-based Operator Software
- Guaranteed spare parts availability
- Longer life time
- Lower investment costs
Bucher
Automation will continue to guarantee what you expect: Reliability and
longevity.
1.
Connection for the EPRO - On-Site Operation
The complex
on-site operation with the steel manifolds, the blow and blankside operator
panels and the section interface boards behind, will be continued to be used
together with the field wiring.
2.
Connection for the EPRO - Valvedriver-Bus
The
complete valvedriver system of the EPRO remains. It will be controlled
compatibly by the FMT-MPR via the EIB componentry.
Your Contacts
Michael Maier
Sales
Offers, projekt planning, projekt management, trade fairs
Murat Yolaçan
Sales
Offers, projekt planning, project management, trade fairs